All airlines flying from Lima (LIM) to Mendoza (MDZ).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Valid until 2025-05-08
Fri 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-09
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-10 through 2025-05-16
Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-17
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-18 through 2025-05-24
Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-25
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-26 through 2025-06-01
Mon 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-06-02
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-05 through 2025-06-09
Thu,Fri,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-06-12 through 2025-06-19
Mon,Fri,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-14 through 2025-06-20
Thu,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-06-21 through 2025-07-03
Mon,Fri,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-22 through 2025-07-04
Fri-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-07-05 through 2025-07-13
Mon,Thu 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-07-07 through 2025-07-14
Thu-Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-07-17 through 2025-07-19
Mon,Thu,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-07-20 through 2025-07-24
Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-07-25 through 2025-08-03
Mon 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-07-28
Mon,Fri-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-08-04 through 2025-08-10
Mon,Thu 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-08-07 through 2025-08-14
Mon,Fri,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-08-15 through 2025-08-23
Thu,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-08-17 through 2025-08-21
Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-08-24 through 2025-08-31
Mon 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-08-25 through 2025-09-01
Mon,Thu 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-09-04 through 2025-09-08
Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-09-05 through 2025-09-14
Mon,Thu,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-09-15 through 2025-09-20
Mon,Fri,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-09-19 through 2025-09-26
Mon,Thu 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-09-25 through 2025-10-02
Fri-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-09-27 through 2025-10-05
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-10-06 through 2025-10-12
Mon,Thu,Fri 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A319 (319) 3:40 Effective 2025-10-13 through 2025-10-20
Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective 2025-10-18 through 2025-10-25
Mon,Thu-Sun 01:15 Lima (LIM) 06:55 Mendoza (MDZ)
LATAM Airlines LA 2435 Non-stop Airbus A320 (320) 3:40 Effective from 2025-10-26
Direct Codeshare Flights:
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Valid until 2025-05-08
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Fri 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-09
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-10 through 2025-05-16
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-17
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-18 through 2025-05-24
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-05-25
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-05-26 through 2025-06-01
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Operates only on 2025-06-02
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Thu-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-05 through 2025-06-09
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Thu,Fri,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Effective 2025-06-12 through 2025-06-19
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Fri,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-14 through 2025-06-20
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Thu,Sat 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Effective 2025-06-21 through 2025-07-03
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Fri,Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-06-22 through 2025-07-04
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Fri-Sun 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A320 (320) 3:40 Effective 2025-07-05 through 2025-07-13
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Mon,Thu 01:05 Lima (LIM) 06:45 Mendoza (MDZ)
Aerolineas Argentinas AR 8407 Non-stop Airbus A319 (319) 3:40 Effective 2025-07-07 through 2025-07-14
Codeshare flight, operated by LATAM Airlines.(LA 2435)
Ad flat here 8924483383 I FlightInfo Lower
Parallax here LIM-MDZ
1 2   next


All airlines flying from Lima (LIM) to Mendoza (MDZ).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2025-05-08
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-10 through 2025-05-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-18 through 2025-05-24
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-26 through 2025-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-06-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-05 through 2025-06-09
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-06-12 through 2025-06-19
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-14 through 2025-06-20
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-06-21 through 2025-07-03
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-22 through 2025-07-04
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-07-05 through 2025-07-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-07-07 through 2025-07-14
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-07-17 through 2025-07-19
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-07-20 through 2025-07-24
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-07-25 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-07-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-08-04 through 2025-08-10
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-08-07 through 2025-08-14
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-08-15 through 2025-08-23
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-08-17 through 2025-08-21
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-08-24 through 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-08-25 through 2025-09-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-09-04 through 2025-09-08
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-09-05 through 2025-09-14
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-09-15 through 2025-09-20
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-09-19 through 2025-09-26
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-09-25 through 2025-10-02
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-09-27 through 2025-10-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-10-06 through 2025-10-12
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-10-13 through 2025-10-20
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-10-18 through 2025-10-25
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Effective from 2025-10-26
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 3:40, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Valid until 2025-05-08
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-10 through 2025-05-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-18 through 2025-05-24
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-05-26 through 2025-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Operates only on 2025-06-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-05 through 2025-06-09
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-06-12 through 2025-06-19
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-14 through 2025-06-20
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-06-21 through 2025-07-03
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)

Effective 2025-06-22 through 2025-07-04
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-07-05 through 2025-07-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A320 (320)

Effective 2025-07-07 through 2025-07-14
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2435)
Duration: 3:40, non-stop
Airbus A319 (319)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here LIM-MDZ
Page 1 / 2        next
  • An international route departing from Lima airport, Peru (LIM) and arriving at Mendoza airport, Argentina (MDZ).
  • The flight distance is 1530 miles, or 2463 km.
  • The timezone of the departure airport is UTC-5 , and the timezone of the arrival airport is UTC-3 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 3:40.