| FLIGHT SCHEDULE |
|---|
| Direct Flights: |
| Wed,Sat
20:20
Astana (NQZ) 1
06:50
Seoul Incheon (ICN) 1 KC 209 Non-stop Airbus A321neo (32Q) 6:30 Effective 2026-01-03 through 2026-03-28 The flight arrives 1 day after departure. |
| Wed,Sat,Sun
21:05
Astana (NQZ) 1
07:25
Seoul Incheon (ICN) 1 KC 209 Non-stop Airbus A321neo (32Q) 6:20 Effective 2026-03-29 through 2026-10-21 The flight arrives 1 day after departure. |
| Wed
21:05
Astana (NQZ) 1
07:25
Seoul Incheon (ICN) 1 KC 209 Non-stop Airbus A321neo (32Q) 6:20 Effective from 2026-10-28 The flight arrives 1 day after departure. |